Nearly a month after the first drawings of the ninth grade campus were presented and less than a year after passage of a $109 million bond, drawings of the proposed arts education center were shown at the October 16, 2007, meeting of the San Leandro School Board.
Note that the drawings are subject to change. The full presentation to the School Board, which inlcludes changes to the design over time, is available here. The full presentation also includes drawings of the library expansion and career technology center.
Posted by mike at October 26, 2007 12:36 PM | TrackBack